Different Methods Of Shoring For Structures

By Lena Stephenson


Constantly changing weather and environment contribute to the weakening of structures and buildings. This is dangerous as they can crumble and injure people that happen to pass by. Renovation, constructing new buildings, or repairing structures to make them sturdy again is a tough process.

Backfill and excavation are some of the important construction techniques applicable here. In order to reduce the quantity of the impacts of excavation, shoring system is made. Shoring Massachusetts has a lot of construction firms that perform such effective solutions. This is the process which involves creating support for structures and buildings with shore, metal, or timber props. The process can be done in different angles like vertical or horizontal.

This process also includes shielding which prevents workers from getting hit with falling debris if there are accidental collapses. Raking and foundation are some of the most effective shoring techniques in constructing buildings. Raking uses inclined timber to support the excavation between the wall and the ground. The angle usually at the recommended measurements of sixty to seventy degrees of inclination.

On one hand, the foundation uses the methods of piling and lagging which hold the foundation loads. This part is vital before actually starting the building of the underground part of the building. Vessel and trench construction can also be applied with shoring. But they differ with the use of props as the support system.

Hydraulic pistons can also be used in the process of speed trench excavation. This helps to protect the workers from accidental collapse. The pistons are pumped towards the trench walls and combined with plywood and steel plate as support. I beams also support trenching which is used for bigger excavations.

Steel bars are also used in the excavation process. These are slid into the soil slopes with the inclination basically positioned downwards. Continuous Flight Augering or CAF is another method of trench shoring and uses concrete piles. The concrete piles are used to hold the excavated parts while the drilling operation occurs to create a hole where concrete can be injected into.

Ships are done almost similarly using timber as the support prop. They differ in position though. There is squaring position and vertical position. The first one refers to the upward or horizontal positioning of the timber while the other one refers to the vertical positioning of the timber. Both start from the deck floor to the deck head. The timbers tighten the structure for efficient building.

This process is very technical and needs proper estimation to get it done right. Hence, this also demands human resources with the right knowledge and skills in the field of construction. Well trained individuals, preferably those with experience and certifications, must be the ones who will perform these methods for safety and accuracy.

As always, safety should be the priority in any industry. Construction is very risky so safety protocols must be applied strictly. The use of protective equipment must be implemented as well. Similarly, management in the site should be systematic in order to make sure that the workers adhere to the policies and protocols.